Datacenter disaster recovery plan is an absolute
necessity to protect a company’s investment in communications, information
technology and all other sensitive and vital information of the organization. It
needs to be scalable and flexible so that it can face the damage caused by a
disaster. Every company should have a data centre checklist, along with the
suggested actions to recover from a disaster easily.
Here’s a checklist for
recovering from a disaster:
·
A Well-Written Plan that Evolves with the Company
In case of any damage
caused to the local backup systems and servers, devise a well structured plan
to fall back on. Put that plan in a safe place such as online lockbox service
and update it regularly.
·
Emergency Power
The implementation of an
uninterrupted power supply (UPS) system on systems and critical servers is a
must which will permit for the smooth switching over from primary (utility)
power to an emergency power system during an event of power outage.
·
Elevate storage systems and server level
Be careful about the
location of the IT systems to prevent damage to critical servers from the fire
department, floods and bursting of pipes. The storage systems and servers
should be stationed above the street level and the areas where water can
accumulate, such as the basement should be avoided. For additional protection,
the rack critical systems should be placed high above the floor level in single
storey facilities.
·
Embrace Geographic Diversity
The data of the company
should be backed up at a distant location to protect it from a local disaster,
such as fire, regional disaster like earthquake or flood or a disaster of a
greater proportion like a hurricane. Consideration of redundant off-site backup
storage should be done and should be checked to see whether the system could be
restored to a completely different kind of hardware. This backup should be
present in case the local hardware is unreachable or entirely damaged.
·
Have a Local Backup
A local backup copy is
absolutely necessary if the primary data centre has power but loses the
internet connectivity and there is a requirement to recover data from the
server.
·
Include Disaster Recovery Service Level Agreements
(SLAs) and Conduct Training Drills
Recovering policies and
SLAs should be incorporated in a disaster recovery plan to assure that
data can be recovered any time in the most productive way. Regular disaster
recovery drills should be conducted and the IT staff should be trained
adequately through such drills to ensure effective recovery of data in time of
need.
·
Identify a Minimum of Three Business Site Failover
Locations
This would permit the
recovery of remotely backed up data through Bare Metal Recovery (BMR) to the
servers at the recovery site location and enable the critical business
operations to continue even if the primary data centre is lost.
·
Emergency website for Real-time information
An offsite emergency
website is mandatory to which all the employees of the organization should have
access. Real-time information is communicated to the employees with the help of
this site.
Click
to Read More: DATA
CENTER CHECKLIST FOR RECOVERING FROM A DISASTER
Conclusion
Careful consideration and
assessment of the functions and risks involved in a data centre is vital while
designing a data center
disaster recovery plan and with a well devised plan, damage to a data
centre can be reduced considerably.
The best celebration party press, that's awesomesauce for all interested readers. and it's very interesting content.
ReplyDeleteGermany VPS Server
Nicely you explained everything in your article. Thanks for your information; this is nice and helpful… Definitely going to share this article to my friends.
ReplyDeleteUK VPS Hosting